- A) General Information
- B) The New Building
- C) Technical Information
- D) Schedule Of The Building Process
- E) Costs (Including Taxes)
- F) Publications & Awards
- G) Plans & Photos



The New Building
a | architect(s) | |
---|---|---|
18 | Firm | Lewis&Hickey Architects, www.lewishickey.com/ |
19 | Project Architect | Emily Forde |
20 | Type of project | renovation |
b | aims of the new building | |
---|---|---|
21 | Short description of the main objectives and purposes of the project | Full vision for project available at http://www.ed.ac.uk/schools-departments/information-services/services/library-museum-gallery/using-library/mlrp/redevelopment/vision Brief project vision is: The redeveloped Main Library building will be: - An intellectual hub for the University - The focus for a wide range of activities in learning and research - A place where users can engage and converse with each other and with information specialists - More open and accessible - Flexible to accommodate changes in the future |
c | special features | |
---|---|---|
22 | Site | Location on campus in square which is all University buildings. Location is between 2 green spaces, George Square and the Meadows. Redevelopment has “brought the outside in”. |
23 | Architecture | Original building designed by Sir Basil Spence and opened in 1967. For history of building see http://www.ed.ac.uk/schools-departments/information-services/services/library-museum-gallery/using-library/mlrp/redevelopment/history Building was A listed in 2005. Building is rectilinear, very fine finishes - exposed polished concrete frame, polished concrete pillars, finishes in teak and beech. Exterior is primarily horizontal. Modular grid is 27 square feet. Redevelopment is of similar high quality, retaining listed features. Modest introduction of highlight colours, and elliptical shape based on the proportions of the building plan. |