Technical Information
a | floor area (24-35) | |
---|---|---|
24 | Total gross floor area | 26 000 m² |
divided into | ||
25 | Open access services | 4 500 m² |
special rooms for (26-29) | ||
26 | Audiovisual | 115 m², room with 12 cabines and a central desk |
27 | Computers | no special rooms but special computer desks, bring your own laptop, wireless access is provided |
28 | Special collections | are digital available |
29 | Seminar room(s) | 668 m², rooms ranging from 65 to 140 m² |
special activities (30-32) | ||
30 | Exhibition space | 110 m² and 280 m² on the first floor, here is a special "computer floor" constructed for easy acces to electrical power and data access points |
31 | Lecture hall | no |
32 | Public refreshments | 116 m² canteen for food and (soft) drinks, lunches are served |
33 | Administration and staff areas | 717 m² |
34 | Closed access stacks | 6 500 m shelves in another building |
35 | Circulations areas (corridors, stairs, lifts), toilets, technical rooms, etc. | 350 m² corridors, 150 m² toilets, 420 m² technical rooms |
36 | Further information | the library is situated on 3 levels |
37 | Number of reader seats (total) | 1000 |
divided into | ||
38 | Audiovisual | 12 |
39 | Computers | 600 in the library |
40 | Seminar room(s) | 8 |
41 | Regular | about 400 |
b | total potential capacity of shelving | |
---|---|---|
42 | Books and periodicals (total) | 4 300 open shelving and 6500 closed shelving |
including | ||
43 | Open access stacks | 4 300 |
44 | Closed access stacks | 6 500 |
45 | Compact shelving | no |
46 | Audiovisual materials | 6 |
47 | Other | no |
48 | Number of staff required to operate the new library | 49 |
c | mechanical features | |
---|---|---|
49 | Ventilation/Air Conditioning | Balanced mechanical supply and return of air. If necessary, the air is cooled from the WKO of the TU/e. (WKO=warmte/koude opslag = heat and cold storage). |
50 | Heating | The substructure/downstairs/ground floor is heated with radiant heat. The superstructure/upper floor(s) are heated with forced hot air. |
51 | Lighting | Individually adjustable lighting that is also day light dependent. Lights are turned on by hand. Lights will turn off when there is no more movement in the room. (motion sensored) |
52 | Acoustics | Drop ceilings with absorption defined by use (prevention of echoing) and inner walls with acoustic insulation. (i.e. Drop ceilings engineered to absorb echoing, and inner walls with acoustic insulation.) |
53 | Lifts, elevators, escalators | Energy efficient elevators (5 units), operable from the security booth |
54 | Book transportation system | no special systems |
55 | Theft detection | RFID |
56 | Building management system | LON-/GBS, a campus system |
57 | Type of IT infrastructure | Cables: CAT 6A (for the departmen of Mathematics and Computer Science) and wireless with access points for students. |
58 | Other |