- A) General Information
- B) The New Building
- C) Technical Information
- D) Schedule Of The Building Process
- E) Costs (Including Taxes)
- F) Publications & Awards
- G) Plans & Photos
Technical Information
a | floor area (24-35) | |
---|---|---|
24 | Total gross floor area | 9 265 m² |
divided into | ||
25 | Open access services | 4 000 m² |
special rooms for (26-29) | ||
26 | Audiovisual | 120 m² |
27 | Computers | 200 m² |
28 | Special collections | 400 m² (historian Durica collection) |
29 | Seminar room(s) | 300 m² |
special activities (30-32) | ||
30 | Exhibition space | 320 m² |
31 | Lecture hall | 200 m² |
32 | Public refreshments | 240 m² |
33 | Administration and staff areas | 1 130 m² |
34 | Closed access stacks | 110 m² |
35 | Circulations areas (corridors, stairs, lifts), toilets, technical rooms, etc. | 1 800 m² |
36 | Further information | 7 administration levels, 4 public levels, 1 basement (archives, technical rooms) |
37 | Number of reader seats (total) | 570 |
divided into | ||
38 | Audiovisual | 30 |
39 | Computers | 140 |
40 | Seminar room(s) | 150 |
41 | Regular | 250 |
b | total potential capacity of shelving | |
---|---|---|
42 | Books and periodicals (total) | 22 540 linear metres (790 000 volumes) |
including | ||
43 | Open access stacks | 5 400 linear metres (190 000 volumes) |
44 | Closed access stacks | 17 140 linear metres (600 000 volumes) |
45 | Compact shelving | 0 |
46 | Audiovisual materials | 0 |
47 | Other | 0 |
48 | Number of staff required to operate the new library | 21 |
c | mechanical features | |
---|---|---|
49 | Ventilation/Air Conditioning | air conditioning with automatic control and regulation |
50 | Heating | underfloor heating combined with air conditioning, heat pump source and gas heating |
51 | Lighting | main lighting - fluorescent tubes, additional lighting – downlights over the study places |
52 | Acoustics | we expect low levels of noise in open study places; closed and group study rooms are designed for quiet study |
53 | Lifts, elevators, escalators | 3 lifts for 10 people, 1 glazed panoramic lift in entrance place, 2 utility lifts |
54 | Book transportation system | lift + manual hand truck |
55 | Theft detection | magnetic chip in the book + detection gates |
56 | Building management system | automatic control and energy management building, electronic fire alarm, automatic fire-fighting equipment in special archives, etc. |
57 | Type of IT infrastructure | structured data cabling, about 900 possible connections (including about 400 in study places) + wi-fi |
58 | Other |