- A) General Information
- B) The New Building
- C) Technical Information
- D) Schedule Of The Building Process
- E) Costs (Including Taxes)
- F) Publications & Awards
- G) Plans & Photos



Technical Information
a | floor area (24-35) | |
---|---|---|
24 | Total gross floor area | 5665 m² |
divided into | ||
25 | Open access services | 2200 m² |
special rooms for (26-29) | ||
26 | Audiovisual | 1 hall for 91 people 1 lounge - 70 m² |
27 | Computers | 1 computer study, 30 m² |
28 | Special collections | no |
29 | Seminar room(s) | As in No 27. -1 computer study, 30 m² |
special activities (30-32) | ||
30 | Exhibition space | entrance hall 213 m², lounge 70 m² |
31 | Lecture hall | As in No 26. - 1 hall for 91 people, 1 lounge, 70 m² |
32 | Public refreshments | cafeteria 150 m² |
33 | Administration and staff areas | 500 m² |
34 | Closed access stacks | 530 m² , technical rooms 66 m² |
35 | Circulations areas (corridors, stairs, lifts), toilets, technical rooms, etc. | 510 m² ( incl. machine shop 120 m², staff cloakroom 76 m²), car park for 50 cars (1150 m²) |
36 | Further information | 2 levels |
37 | Number of reader seats (total) | 335 seats |
divided into | ||
38 | Audiovisual | 91 seats in hall, 40 seats in lounge |
39 | Computers | 12 seats in computer study, 20 seats in public internet area, 10 seats at computer searching catalogues |
40 | Seminar room(s) | 12 seats in computer study, 40 seats in lounge |
41 | Regular | 162 seats |
b | total potential capacity of shelving | |
---|---|---|
42 | Books and periodicals (total) | 350 000 volumes |
including | ||
43 | Open access stacks | 5 258 linear metres of shelving in open access as projected |
44 | Closed access stacks | 156 linear metres |
45 | Compact shelving | 5 700 linear metres |
46 | Audiovisual materials | |
47 | Other | |
48 | Number of staff required to operate the new library | 40 |
c | mechanical features | |
---|---|---|
49 | Ventilation/Air Conditioning | Air Conditioning with temperature adjustment of air mains, natural ventilation operated automatically |
50 | Heating | Hot-water heating (radiators), the heating source is shared with neighbouring hospital |
51 | Lighting | Natural even lighting all over the open-access space, fluorescent tubing |
52 | Acoustics | |
53 | Lifts, elevators, escalators | 1 public lift, 2 service lifts |
54 | Book transportation system | no |
55 | Theft detection | yes |
56 | Building management system | yes |
57 | Type of IT infrastructure | Planned CAT 6E |
58 | Other | Outside blinds |