a | name and address | |
---|---|---|
1 | Type of library | university [University library] |
2 | Name of library / Name of mother institution | Central Library of the Politehnica University of Timişoara / Politehnica University of Timişoara |
3 | Address | Romania, 300004 Timişoara, Str. Vincenţiu Babeş, nr. 8 |
4 | Phone / Fax / Email |
+40.256.403122 +40.256.403121 bupt@upt.ro |
5 | Name of the director of the library | Dipl eng. Erica Oteşteanu |
6 | Contact person for enquiries |
erica.otesteanu@upt.ro |
b | population served | |
---|---|---|
7 | Current readership, number of registered readers | 13907 |
8 | Number of full time students | 11940 |
9 | Number of part time students | |
10 | Number of staff in institution | 1355 |
c | the old/original building(s) | |
---|---|---|
11 | Total floor area | 2200 sq. metres [in the main building and 5 small branches of the Central Library, in different University buildings] |
12 | Number of reader seats | 80 [in all branches] |
13 | Total capacity of shelving | 8350 linear metres |
14 | …in open access storage | 1129 linear metres |
15 | …in closed access stacks | 7221 linear metres |
16 | Number of library staff | 34 |
17 | Opening hours to the public | 50 hours/week, 337 days/year |
a | architect(s) | |
---|---|---|
18 | Firm | S.C. IPROTIM TIMIŞOARA |
19 | Project Architect | Sava BUGAR |
20 | Type of project |
b | aims of the new building | |
---|---|---|
21 | Short description of the main objectives and purposes of the project | To move out from an old, not dedicated building which was totally inappropriate for library activities; to create suitable space in which to promote the typical 21st century innovative way to knowledge assimilation; to offer attractive space for study and work, with an increased number of the reading places, including group study rooms; to increase the book storage capacity and holdings in open stacks; to allowed a wide access to computers, audiovisual materials and electronic resources; to develop the documentation and research library services for the university staff; to create access for users with disabilities; to facilitate self-service loans and returns; to assure controlled access entry; to create exhibitions area; to improve staff working conditions. |
c | special features | |
---|---|---|
22 | Site | The new building is situated in the central part of the city, in close vicinity of the University’s buildings |
23 | Architecture | L shape plan, steel, concrete and glass construction, access for the Disabled, motion sensor light switches |
24 | Total gross floor area | 8394 sq. metres |
divided into | ||
---|---|---|
25 | Open access services | 2287 sq. metres [2287 m² open access services; 249 m² 24 hours access reading room] |
special rooms for (26-29) | ||
26 | Audiovisual | 148 sq. metres [on the 4th floor, consisting in furniture using space division; space usage for 6-10 students] |
27 | Computers | 769 sq. metres |
28 | Special collections | 191 sq. metres [for standards and patterns, considering the technical profile of the university: 60 m² controlled access to old books] |
29 | Seminar room(s) | 98 m2, in 5 small groups study rooms
231 m2, in 26 study carrels for teaching staff |
special activities (30-32) | ||
30 | Exhibition space | 333 sq. metres |
31 | Lecture hall | 102m² 2 distance learning rooms, 123 m² multifunctional room |
32 | Public refreshments | 117 sq. metres |
33 | Administration and staff areas | 538 sq. metres [situated in the basement and on ground floor] |
34 | Closed access stacks | 1476 sq. metres [divided in two levels, basement and ground floor] |
35 | Circulations areas (corridors, stairs, lifts), toilets, technical rooms, etc. | 1418 sq. metres [corridors, stairs, lifts, toilets; 250m² technical spaces; 34m² book store; 133m² parking space] |
36 | Further information | 6 levels: 2 administrative and 4 dedicated to the public, housing the modern collections, and the IT space. |
37 | Number of reader seats (total) | 814 |
divided into | ||
38 | Audiovisual | 76 |
39 | Computers | 180 |
40 | Seminar room(s) | 77 |
41 | Regular | 481 |
b | total potential capacity of shelving | |
---|---|---|
42 | Books and periodicals (total) | 13736 linear metres |
including | ||
43 | Open access stacks | 2996 linear metres |
44 | Closed access stacks | 10850 linear metres |
45 | Compact shelving | 10850 linear metres [equal to 44 (all closed access stacks are equipped with compact shelves)] |
46 | Audiovisual materials | 115 linear metres |
47 | Other | |
48 | Number of staff required to operate the new library | 64 |
c | mechanical features | |
---|---|---|
49 | Ventilation/Air Conditioning | See 50 |
50 | Heating | Supplied by the building’s own heating plant |
51 | Lighting | Controlled by a Merten KNX/DALI system, integrated in the building power distribution monitoring system; special lighting on each desk. |
52 | Acoustics | Sound system: Bosch |
53 | Lifts, elevators, escalators | 2 lifts |
54 | Book transportation system | 2 elevators, trolleys |
55 | Theft detection | Anti-Intrusion system: Honeywell -Novar |
56 | Building management system | Fire Alarm; Fire Extinguish; Voice Alarm; Access Contro; Data - Voice; CCTV; Power Monitoring System |
57 | Type of IT infrastructure | IP network 800 Gbps traffic capacity (1Gbps access with 10GE uplinks); ubiquitous wireless: 802.11/a/b/g - efective bandwidth of 20Mbps |
58 | Other | 3M RFID automated loan and return system, 3M RFID protection system |
59 | Planning, preliminary brief | 2004 |
60 | Architectural competition | 2004 |
61 | Period of project | 2006-2013 |
62 | Opening of the construction work | 2006 |
63 | Conclusion of the construction | Internal management, realized by Civil Engineering Faculty staff, members of the library staff and the technical department of the University. |
64 | Furnishing and moving the collections | |
65 | Opening of the new building for public | October 2014 |
66 | Site | |
67 | Building | 8233000 euro |
68 | Furniture and equipment | 3190000 euro |
69 | Fees | |
70 | Total | 11476000 euro |
71 | Operating costs | |
72 | Funding (Type of commission and source of funding) |