a | name and address | |
---|---|---|
1 | Type of library | university |
2 | Name of library / Name of mother institution | Vienna University of Economics and Business |
3 | Address | Welthandelsplatz 1, Building LC, 1010 Vienna, Austria |
4 | Phone / Fax / Email |
+43-1-313 36-0 +43-1-313 36 90 4910 bibliothek@wu.ac.at |
5 | Name of the director of the library | Nikolaus Berger |
6 | Contact person for enquiries |
Nikolaus Berger nikolaus.berger@wu.ac.at +43-1-313 36-4910 |
b | population served | |
---|---|---|
7 | Current readership, number of registered readers | 150000 |
8 | Number of full time students | 24000 |
9 | Number of part time students | |
10 | Number of staff in institution | 2200 |
c | the old/original building(s) | |
---|---|---|
11 | Total floor area | 4000 sq. metres |
12 | Number of reader seats | 630 |
13 | Total capacity of shelving | 800000 volumes |
14 | …in open access storage | 30000 volumes |
15 | …in closed access stacks | 750000 volumes |
16 | Number of library staff | 47 |
17 | Opening hours to the public | 74 Stunden an 6 Öffnungstagen |
a | architect(s) | |
---|---|---|
18 | Firm | Zaha Hadid Architects |
19 | Project Architect | Cornelius Schlotthauer |
20 | Type of project | (Neubau der gesamten WU (Wirtschaftsuniversität Wien) in Campusform. Das Zentrum und Landmarkgebäude ist das Library & Learning Center. http://www.campuswu.at/) |
b | aims of the new building | |
---|---|---|
21 | Short description of the main objectives and purposes of the project | Das Zentrum der WU bildet sowohl physisch als auch symbolisch ein Library und Learning Center, das mehr sein soll als eine klassische Bibliothek: Es ist gleichzeitig Bibliothek und Servicecenter, Arbeitsplatz und Lounge, Kommunikationsraum und Verkehrsknotenpunkt. Zentrale Funktionen des Studiums werden miteinander kombiniert, der Forschung wird ein Informationszentrum mit Mehrwert geboten. |
c | special features | |
---|---|---|
22 | Site | Das Gebäude ist zentral in der Mitte des Campus gelegen. |
23 | Architecture | Das symbolische und geografische Herzstück dieses Campus der Zukunft bildet das täglich 24 Stunden geöffnete Library & Learning Center. Umgesetzt wird dieses von der deutschen Niederlassung Zaha Hadids in Hamburg mit einem expressiven, markanten Bau. Ausdrucksstark ist das weit auskragende Dach des S-förmigen Gebäudes. Der davorliegende zentrale Platz geht fließend über in den Haupteingangsbereich und die Aula. Die BesucherInnen werden im Inneren über Rampen und Treppen spiralförmig durch die Bibliothek nach oben geführt, wo sich Bücher, Studienplätze und großartige Ausblicke auf den Campus mischen. Im Erdgeschoß befinden sich die Festsäle der WU sowie ein Library Cafe und eine Buchhandlung. In diesem Gebäude sind auch verschiedene Studierenden-Services und das Zentrum für Berufsplanung untergebracht. |
24 | Total gross floor area | 37761 sq. metres |
divided into | ||
---|---|---|
25 | Open access services | 15703 sq. metres |
special rooms for (26-29) | ||
26 | Audiovisual | |
27 | Computers | |
28 | Special collections | |
29 | Seminar room(s) | |
special activities (30-32) | ||
30 | Exhibition space | |
31 | Lecture hall | 100 sq. metres |
32 | Public refreshments | 100 sq. metres |
33 | Administration and staff areas | 2568 sq. metres |
34 | Closed access stacks | |
35 | Circulations areas (corridors, stairs, lifts), toilets, technical rooms, etc. | 5700 sq. metres |
36 | Further information | |
37 | Number of reader seats (total) | 1500 |
divided into | ||
38 | Audiovisual | |
39 | Computers | 70 |
40 | Seminar room(s) | 300 |
41 | Regular | 1200 |
b | total potential capacity of shelving | |
---|---|---|
42 | Books and periodicals (total) | 26445 linear metres |
including | ||
43 | Open access stacks | 21973 linear metres |
44 | Closed access stacks | 4472 linear metres |
45 | Compact shelving | 14403 linear metres |
46 | Audiovisual materials | |
47 | Other | |
48 | Number of staff required to operate the new library | 64 |
c | mechanical features | |
---|---|---|
49 | Ventilation/Air Conditioning | Im Hohlraumboden geführte Luft. Nur im Buchmagazin Klimaanlage. Geothermie erzeugt 70% des für Heizung und Kühlung benötigten Energiebedarfs des Campus. |
50 | Heating | Wärmepumpe, lediglich für Spitzenlasten und Hochtemperatur-Verbraucher wird noch ein Fernwärmeanschluss benötigt. Betonkernaktivierung mit zusätzlichen Heizkörpern oder Bodenkonvektoren. |
51 | Lighting | Leuchtstoffröhren in Rastergehäuse |
52 | Acoustics | |
53 | Lifts, elevators, escalators | |
54 | Book transportation system | |
55 | Theft detection | RFID auf UHF Frequenz |
56 | Building management system | |
57 | Type of IT infrastructure | |
58 | Other |
59 | Planning, preliminary brief | 2007 |
60 | Architectural competition | 2008 |
61 | Period of project | 2009 |
62 | Opening of the construction work | 2010 |
63 | Conclusion of the construction | 2010 bis 2013 |
64 | Furnishing and moving the collections | Juli-September 2013 |
65 | Opening of the new building for public | 30. September 2013 |
66 | Site | |
67 | Building | |
68 | Furniture and equipment | |
69 | Fees | |
70 | Total | 492000000 euro [Für 6 Neubauten von 6 internationalen Architekturbüros insgesamt: 492.000.000 Euro Gesamtkosten
http://www.campuswu.at/de/info/gesamtprojekt/] |
71 | Operating costs | |
72 | Funding (Type of commission and source of funding) | public |