Liber logo LiberLAG logo


General Information

a name and address
1 Type of library university
2 Name of library / Name of mother institution Vienna University of Economics and Business
3 Address Welthandelsplatz 1, Building LC, 1010 Vienna, Austria
4 Phone / Fax / Email +43-1-313 36-0
+43-1-313 36 90 4910
bibliothek@wu.ac.at
5 Name of the director of the library Nikolaus Berger
6 Contact person for enquiries Nikolaus Berger
nikolaus.berger@wu.ac.at
+43-1-313 36-4910
b population served
7 Current readership, number of registered readers 150000
8 Number of full time students 24000
9 Number of part time students
10 Number of staff in institution 2200
c the old/original building(s)
11 Total floor area 4000 sq. metres
12 Number of reader seats 630
13 Total capacity of shelving 800000 volumes
14 …in open access storage 30000 volumes
15 …in closed access stacks 750000 volumes
16 Number of library staff 47
17 Opening hours to the public 74 Stunden an 6 Öffnungstagen

The New Building

a architect(s)
18 Firm Zaha Hadid Architects
19 Project Architect Cornelius Schlotthauer
20 Type of project (Neubau der gesamten WU (Wirtschaftsuniversität Wien) in Campusform. Das Zentrum und Landmarkgebäude ist das Library & Learning Center. http://www.campuswu.at/)
b aims of the new building
21 Short description of the main objectives and purposes of the project Das Zentrum der WU bildet sowohl physisch als auch symbolisch ein Library und Learning Center, das mehr sein soll als eine klassische Bibliothek: Es ist gleichzeitig Bibliothek und Servicecenter, Arbeitsplatz und Lounge, Kommunikationsraum und Verkehrsknotenpunkt. Zentrale Funktionen des Studiums werden miteinander kombiniert, der Forschung wird ein Informationszentrum mit Mehrwert geboten.
c special features
22 Site Das Gebäude ist zentral in der Mitte des Campus gelegen.
23 Architecture Das symbolische und geografische Herzstück dieses Campus der Zukunft bildet das täglich 24 Stunden geöffnete Library & Learning Center. Umgesetzt wird dieses von der deutschen Niederlassung Zaha Hadids in Hamburg mit einem expressiven, markanten Bau. Ausdrucksstark ist das weit auskragende Dach des S-förmigen Gebäudes. Der davorliegende zentrale Platz geht fließend über in den Haupteingangsbereich und die Aula. Die BesucherInnen werden im Inneren über Rampen und Treppen spiralförmig durch die Bibliothek nach oben geführt, wo sich Bücher, Studienplätze und großartige Ausblicke auf den Campus mischen. Im Erdgeschoß befinden sich die Festsäle der WU sowie ein Library Cafe und eine Buchhandlung. In diesem Gebäude sind auch verschiedene Studierenden-Services und das Zentrum für Berufsplanung untergebracht.

Technical Information

24 Total gross floor area 37761 sq. metres
divided into
25 Open access services 15703 sq. metres
special rooms for (26-29)
26 Audiovisual
27 Computers
28 Special collections
29 Seminar room(s)
special activities (30-32)
30 Exhibition space
31 Lecture hall 100 sq. metres
32 Public refreshments 100 sq. metres
33 Administration and staff areas 2568 sq. metres
34 Closed access stacks
35 Circulations areas (corridors, stairs, lifts), toilets, technical rooms, etc. 5700 sq. metres
36 Further information
37 Number of reader seats (total) 1500
divided into
38 Audiovisual
39 Computers 70
40 Seminar room(s) 300
41 Regular 1200
b total potential capacity of shelving
42 Books and periodicals (total) 26445 linear metres
including
43 Open access stacks 21973 linear metres
44 Closed access stacks 4472 linear metres
45 Compact shelving 14403 linear metres
46 Audiovisual materials
47 Other
48 Number of staff required to operate the new library 64
c mechanical features
49 Ventilation/Air Conditioning Im Hohlraumboden geführte Luft. Nur im Buchmagazin Klimaanlage. Geothermie erzeugt 70% des für Heizung und Kühlung benötigten Energiebedarfs des Campus.
50 Heating Wärmepumpe, lediglich für Spitzenlasten und Hochtemperatur-Verbraucher wird noch ein Fernwärmeanschluss benötigt. Betonkernaktivierung mit zusätzlichen Heizkörpern oder Bodenkonvektoren.
51 Lighting Leuchtstoffröhren in Rastergehäuse
52 Acoustics
53 Lifts, elevators, escalators
54 Book transportation system
55 Theft detection RFID auf UHF Frequenz
56 Building management system
57 Type of IT infrastructure
58 Other

Schedule Of The Building Process

59 Planning, preliminary brief 2007
60 Architectural competition 2008
61 Period of project 2009
62 Opening of the construction work 2010
63 Conclusion of the construction 2010 bis 2013
64 Furnishing and moving the collections Juli-September 2013
65 Opening of the new building for public 30. September 2013

Costs (Including Taxes)

66 Site
67 Building
68 Furniture and equipment
69 Fees
70 Total 492000000 euro [Für 6 Neubauten von 6 internationalen Architekturbüros insgesamt: 492.000.000 Euro Gesamtkosten
http://www.campuswu.at/de/info/gesamtprojekt/]
71 Operating costs
72 Funding (Type of commission and source of funding) public

Publications & Awards

Plans & Photos

thumbnail
doctype: exterior
caption: Library & Learning Center WU (Vienna University of Economis and Business)
copyright owner: Zaha Hadid Architects
thumbnail
doctype: interior
caption: Forum Library & Learning Center
copyright owner: BOANet
thumbnail
doctype: interior
caption: Forum Library & Learning Center
copyright owner: BOANet