a | name and address | |
---|---|---|
1 | Type of library | university [University] |
2 | Name of library / Name of mother institution | John Paul II Library / National University of Ireland, Maynooth |
3 | Address | Maynooth Co KildareIRELAND |
4 | Phone / Fax / Email | |
5 | Name of the director of the library | Cathal McCauley |
6 | Contact person for enquiries | (Cathal McCauley) |
b | population served | |
---|---|---|
7 | Current readership, number of registered readers | 10 000 |
8 | Number of full time students | 7 000 |
9 | Number of part time students | 2 000 |
10 | Number of staff in institution | 600 |
c | the old/original building(s) | |
---|---|---|
11 | Total floor area | 4 000 m² |
12 | Number of reader seats | 680 |
13 | Total capacity of shelving | 330 000 volumes |
14 | …in open access storage | 320 000 volumes |
15 | …in closed access stacks | 10 000 volumes |
16 | Number of library staff | 49 |
17 | Opening hours to the public | 72 hours per week during academic year |
a | architect(s) | |
---|---|---|
18 | Firm | Scott Tallon Walker |
19 | Project Architect | StJohn Handley |
20 | Type of project |
b | aims of the new building | |
---|---|---|
21 | Short description of the main objectives and purposes of the project | Address need for greater stock and seating capacity while also meet demand for 24/7 capability, ubiquitous wifi, more end-user power supply, teaching rooms and a range of student space from the social to the silent. |
c | special features | |
---|---|---|
22 | Site | Located in Maynooth Ireland’s only University town, the campus is divided by a road into north and south with the library in the centre acting as a nexus. The campus hosts two institutions – National University of Ireland, Maynooth and St. Patrick’s College Maynooth and the library serves both. |
23 | Architecture | The extension is based on a precast concrete grid of 6.5 metres. There is a glass twin wall system on the upper floors. The building complies with all access and safety regulations including for example the provision for a mothering room. The building has a range of green features including water attenuation tanks, seeded roof, smart lighting. A virtual fly through can be viewed at: http://www.youtube.com/watch?v=AKaiUGm6m8U |
24 | Total gross floor area | The total library will have a floor area of 10 200 m² of which 6 200 is the new extension |
divided into | ||
---|---|---|
25 | Open access services | 7 950 m² |
special rooms for (26-29) | ||
26 | Audiovisual | none dedicated |
27 | Computers | |
28 | Special collections | 190 m² |
29 | Seminar room(s) | 211 m² |
special activities (30-32) | ||
30 | Exhibition space | 84.5 m² |
31 | Lecture hall | none |
32 | Public refreshments | 116.19 m² |
33 | Administration and staff areas | 1 400 m² |
34 | Closed access stacks | 90 m² |
35 | Circulations areas (corridors, stairs, lifts), toilets, technical rooms, etc. | - |
36 | Further information | 3 levels, all accessible by registered users, only the front of the ground floor will be totally open to the public |
37 | Number of reader seats (total) | 1 500 |
divided into | ||
38 | Audiovisual | no dedicated seating |
39 | Computers | 50 |
40 | Seminar room(s) | 262 |
41 | Regular | 1 188 |
b | total potential capacity of shelving | |
---|---|---|
42 | Books and periodicals (total) | 450 000 volumes |
including | ||
43 | Open access stacks | 356 000 volumes |
44 | Closed access stacks | 17 000 volumes |
45 | Compact shelving | 72 000 volumes (not included in 43 or 44) |
46 | Audiovisual materials | 5 000 volumes |
47 | Other | N/A |
48 | Number of staff required to operate the new library | 2 additional staff onto existing staff of FTE in this library of 45. |
c | mechanical features | |
---|---|---|
49 | Ventilation/Air Conditioning | natural using twin wall system |
50 | Heating | natural using twin wall system |
51 | Lighting | smart lighting throughout |
52 | Acoustics | use of materials and coffers in precast concrete |
53 | Lifts, elevators, escalators | 2 lifts |
54 | Book transportation system | no |
55 | Theft detection | electro magnetic tattle tape based |
56 | Building management system | yes |
57 | Type of IT infrastructure | wired to deliver all fixed points with 1GB, wifi throughout |
58 | Other |
59 | Planning, preliminary brief | commenced 2006 |
60 | Architectural competition | 2008 |
61 | Period of project | 2010 |
62 | Opening of the construction work | December 2010 |
63 | Conclusion of the construction | due to complete autumn 2012 |
64 | Furnishing and moving the collections | summer 2012 |
65 | Opening of the new building for public | October/December 2012 |
66 | Site | N/A |
67 | Building | 20 million EUR |
68 | Furniture and equipment | N/A |
69 | Fees | N/A |
70 | Total | N/A |
71 | Operating costs | |
72 | Funding (Type of commission and source of funding) |