Liber logo LiberLAG logo


General Information

a name and address
1 Type of library university [Bibliothèque universitaire]
2 Name of library / Name of mother institution Bibliothèque universitaire - Section Santé / Université de NANTES
3 Address 9 rue Bias44011 NANTES Cedex 1 (France)
4 Phone / Fax / Email (+33 2 53 47 47 00 / +33 2 53 48 47 13)
5 Name of the director of the library Madame Hélène GROGNET
6 Contact person for enquiries (Monsieur Jean-Philippe SOUAN)
b population served
7 Current readership, number of registered readers 3 752
8 Number of full time students 5 050
9 Number of part time students n.c.
10 Number of staff in institution 890
c the old/original building(s)
11 Total floor area 3 168 m²
12 Number of reader seats 290
13 Total capacity of shelving 6 800 mètres linéaires
14 …in open access storage 2 245 mètres linéaires
15 …in closed access stacks 4 555 mètres linéaires
16 Number of library staff 15,9
17 Opening hours to the public 57 heures/semaine; 272 jours/an

The New Building

a architect(s)
18 Firm Jean-Pierre LOTT – 31 rue Coquillière 75001 PARIS, www.jplott.fr/
19 Project Architect
20 Type of project
b aims of the new building
21 Short description of the main objectives and purposes of the project Davantage de documents en libre accès. Davantage de places de consultation. Accroissement des documents informatiques et audiovisuels et mise à disposition des matériels nécessaires à leur consultation. Formation des lecteurs (salle de formation). Augmentation des horaires d’ouverture au public : 104 h 30 par semaine de septembre à fin mai ; 47 h 30 de juin à août.
c special features
22 Site Localisation de la bibliothèque dans la ville, proche de l’université et proche des transports publics.
23 Architecture Plan rectangulaire: 6 022 m2 sur 3 niveaux (niveaux 4, 5 et 6 du bâtiment). Panneaux préfabriqués en béton sur la façade nord. Autres façades très vitrées. Dimension de la trame de construction : 7 m x 7 m entre les poteaux. Matériaux utilisés pour réduire les coûts de maintenance: double paroi vitrée sur la façade sud; pas de faux-plafonds pour minimiser les interventions ultérieures; gestion automatique de l’éclairage artificiel.

Technical Information

24 Total gross floor area 6 022 m²
divided into
25 Open access services 4 820 m²
special rooms for (26-29)
26 Audiovisual Surface comptée avec l’informatique
27 Computers
28 Special collections 24 m²
29 Seminar room(s) 60 m²; 6 salles de travail en groupe (4, 6, 8, et 3 fois 12 places)
special activities (30-32)
30 Exhibition space 221 m²
31 Lecture hall Voir salle de formation (point 29)
32 Public refreshments A l’extérieur de la bibliothèque
33 Administration and staff areas 420 m²
34 Closed access stacks 782 m²
35 Circulations areas (corridors, stairs, lifts), toilets, technical rooms, etc. n.c.
36 Further information 3 niveaux publics
37 Number of reader seats (total) 635
divided into
38 Audiovisual Commun avec informatique (point 39)
39 Computers 100
40 Seminar room(s) 25 places en Formation ou 50 places en Réunion/Conférence
41 Regular 510
b total potential capacity of shelving
42 Books and periodicals (total) 12 920 mètres linéaires
including
43 Open access stacks 5 920 mètres linéaires
44 Closed access stacks 7 000 mètres linéaires
45 Compact shelving 6 000 mètres linéaires
46 Audiovisual materials n.c.
47 Other Fonds ancien: 1 000 mètres linéaires
48 Number of staff required to operate the new library 16,5 équivalents temps plein. Manque 1 emploi.
c mechanical features
49 Ventilation/Air Conditioning Ventilation
50 Heating Radiateurs
51 Lighting Automatisé pour économies d’énergie
52 Acoustics Système de sonorisation + baffles acoustiques
53 Lifts, elevators, escalators 1 monte-charges de 1 250 kg
54 Book transportation system Non
55 Theft detection Oui
56 Building management system Oui
57 Type of IT infrastructure Ethernet 100 Mbits par seconde
58 Other

Schedule Of The Building Process

59 Planning, preliminary brief 2001
60 Architectural competition 2002
61 Period of project 2008
62 Opening of the construction work 2009
63 Conclusion of the construction 14 mois
64 Furnishing and moving the collections 2011
65 Opening of the new building for public 16 août 2011

Costs (Including Taxes)

66 Site Appartient à l’agglomération de NANTES Métropole
67 Building 13 M € TTC
68 Furniture and equipment 1,1 M € TTC
69 Fees 10% du coût des travaux
70 Total 4,1 M € TTC
71 Operating costs
72 Funding (Type of commission and source of funding)

Publications & Awards