Technical Information
a | floor area (24-35) | |
---|---|---|
24 | Total gross floor area | 16300 sq. metres |
divided into | ||
25 | Open access services | 3850 sq. metres |
special rooms for (26-29) | ||
26 | Audiovisual | |
27 | Computers | |
28 | Special collections | |
29 | Seminar room(s) | 7 group work rooms, 1 parents-children room, 1 training room |
special activities (30-32) | ||
30 | Exhibition space | |
31 | Lecture hall | |
32 | Public refreshments | |
33 | Administration and staff areas | |
34 | Closed access stacks | |
35 | Circulations areas (corridors, stairs, lifts), toilets, technical rooms, etc. | |
36 | Further information | |
37 | Number of reader seats (total) | 420 |
divided into | ||
38 | Audiovisual | |
39 | Computers | 37 |
40 | Seminar room(s) | 66 |
41 | Regular | 317 |
b | total potential capacity of shelving | |
---|---|---|
42 | Books and periodicals (total) | 392000 monograph volumes , 452 current periodicals, all in open stacks |
including | ||
43 | Open access stacks | |
44 | Closed access stacks | |
45 | Compact shelving | |
46 | Audiovisual materials | |
47 | Other | |
48 | Number of staff required to operate the new library | 15 |
c | mechanical features | |
---|---|---|
49 | Ventilation/Air Conditioning | Underground channel under the baseplate is used for the pre-conditioning of the outside air, and thus reduces energy consumption. |
50 | Heating | Cooling in summer and heating in winter through a concrete core activation. |
51 | Lighting | |
52 | Acoustics | |
53 | Lifts, elevators, escalators | |
54 | Book transportation system | |
55 | Theft detection | RFID |
56 | Building management system | |
57 | Type of IT infrastructure | |
58 | Other | Rainwater is collected in an external tank and used as a service water. |