- A) General Information
- B) The New Building
- C) Technical Information
- D) Schedule Of The Building Process
- E) Costs (Including Taxes)
- F) Publications & Awards
- G) Plans & Photos



Technical Information
a | floor area (24-35) | |
---|---|---|
24 | Total gross floor area | 16000 sq. metres |
divided into | ||
25 | Open access services | 12000 sq. metres |
special rooms for (26-29) | ||
26 | Audiovisual | |
27 | Computers | |
28 | Special collections | 445 sq. metres |
29 | Seminar room(s) | 215 sq. metres |
special activities (30-32) | ||
30 | Exhibition space | 300 sq. metres [Approx. 300 square metres; 20 showcases - some in historic areas and some in new-build; various exhibition spaces in new-build.] |
31 | Lecture hall | 692 sq. metres [Flexible space also used as a children's library] |
32 | Public refreshments | 208 sq. metres [Café run by third party operator] |
33 | Administration and staff areas | 520 sq. metres [Mezzanine floor] |
34 | Closed access stacks | 1930s library stack refurbished = 1,100 square metres, and new state of the art repository built to meet CHYBÍ!!! |
35 | Circulations areas (corridors, stairs, lifts), toilets, technical rooms, etc. | |
36 | Further information | 4 floors |
37 | Number of reader seats (total) | 500 |
divided into | ||
38 | Audiovisual | |
39 | Computers | 160 |
40 | Seminar room(s) | see 29 |
41 | Regular |
b | total potential capacity of shelving | |
---|---|---|
42 | Books and periodicals (total) | 35000 linear metres [includes archives] |
including | ||
43 | Open access stacks | 10000 linear metres |
44 | Closed access stacks | 25000 linear metres |
45 | Compact shelving | 17000 linear metres [included in 44] |
46 | Audiovisual materials | 300 linear metres |
47 | Other | |
48 | Number of staff required to operate the new library | 38 |
c | mechanical features | |
---|---|---|
49 | Ventilation/Air Conditioning | |
50 | Heating | |
51 | Lighting | |
52 | Acoustics | |
53 | Lifts, elevators, escalators | Escalator, two passenger lifts and four staff lifts |
54 | Book transportation system | Trolleys |
55 | Theft detection | CCTV and book tags (3M system) |
56 | Building management system | |
57 | Type of IT infrastructure | Category 6A cabling plus Wi-Fi |
58 | Other |