- A) General Information
- B) The New Building
- C) Technical Information
- D) Schedule Of The Building Process
- E) Costs (Including Taxes)
- F) Publications & Awards
- G) Plans & Photos



Technical Information
a | floor area (24-35) | |
---|---|---|
24 | Total gross floor area | 3126 sq. metres [1st stage – 1081 sq. meters
2nd stage – 2045 sq. meters Total area – 3126 sq. meters] |
divided into | ||
25 | Open access services | 1650 sq. metres |
special rooms for (26-29) | ||
26 | Audiovisual | 204 sq. metres |
27 | Computers | computers in the open areas |
28 | Special collections | 219 sq. metres |
29 | Seminar room(s) | 48 sq. metres |
special activities (30-32) | ||
30 | Exhibition space | 156 sq. metres |
31 | Lecture hall | |
32 | Public refreshments | 42 sq. metres |
33 | Administration and staff areas | 155 sq. metres |
34 | Closed access stacks | 231 sq. metres |
35 | Circulations areas (corridors, stairs, lifts), toilets, technical rooms, etc. | 288 sq. metres |
36 | Further information | 4 levels - 2 public levels |
37 | Number of reader seats (total) | 188 [reader places] |
divided into | ||
38 | Audiovisual | |
39 | Computers | 14 [computer places] |
40 | Seminar room(s) | 16 [places] |
41 | Regular | 158 [places] |
b | total potential capacity of shelving | |
---|---|---|
42 | Books and periodicals (total) | 8063 linear metres [1st stage – 4 025 linear meters
2nd stage – 4 038 linear meters] |
including | ||
43 | Open access stacks | 4491 linear metres [264378 volumes] |
44 | Closed access stacks | 3572 linear metres [43063 volumes] |
45 | Compact shelving | 3572 linear metres [included in 44] |
46 | Audiovisual materials | 5359 linear metres |
47 | Other | |
48 | Number of staff required to operate the new library | 23 |
c | mechanical features | |
---|---|---|
49 | Ventilation/Air Conditioning | Air conditioning with cooling with automatic control |
50 | Heating | Central heating system with automatic control |
51 | Lighting | General lighting. The bright sunlight is reduced by the louvers in the windows and shielding on the façade. |
52 | Acoustics | Acoustic tiles in the ventilation engine room |
53 | Lifts, elevators, escalators | 1 lift |
54 | Book transportation system | no |
55 | Theft detection | yes |
56 | Building management system | yes |
57 | Type of IT infrastructure | LAN (1 Gb) class 6A, WiFi available everywhere |
58 | Other | automatic shading system |