- A) General Information
- B) The New Building
- C) Technical Information
- D) Schedule Of The Building Process
- E) Costs (Including Taxes)
- F) Publications & Awards
- G) Plans & Photos



Technical Information
a | floor area (24-35) | |
---|---|---|
24 | Total gross floor area | 11700 sq. metres |
divided into | ||
25 | Open access services | 8370 sq. metres |
special rooms for (26-29) | ||
26 | Audiovisual | 50 sq. metres |
27 | Computers | N/A |
28 | Special collections | N/A |
29 | Seminar room(s) | 1003 sq. metres |
special activities (30-32) | ||
30 | Exhibition space | 163 sq. metres |
31 | Lecture hall | 316 sq. metres |
32 | Public refreshments | 256 sq. metres |
33 | Administration and staff areas | 887 sq. metres |
34 | Closed access stacks | 651 sq. metres |
35 | Circulations areas (corridors, stairs, lifts), toilets, technical rooms, etc. | N/A |
36 | Further information | 5 niveaux accessibles au public |
37 | Number of reader seats (total) | 974 [Hors salle de conférence et cafétéria.] |
divided into | ||
38 | Audiovisual | 20 |
39 | Computers | 186 |
40 | Seminar room(s) | 142 |
41 | Regular | 626 [Dont 36 pour l'espace presse, 118 pour des places de travail collaboratif et 120 pour des places de détente.] |
b | total potential capacity of shelving | |
---|---|---|
42 | Books and periodicals (total) | 12779 linear metres |
including | ||
43 | Open access stacks | 4365 linear metres |
44 | Closed access stacks | 8414 linear metres |
45 | Compact shelving | 8414 linear metres |
46 | Audiovisual materials | N/A |
47 | Other | N/A |
48 | Number of staff required to operate the new library | 69 [Estimation basée sur le document http://hdl.handle.net/10993/896] |
c | mechanical features | |
---|---|---|
49 | Ventilation/Air Conditioning | |
50 | Heating | |
51 | Lighting | |
52 | Acoustics | |
53 | Lifts, elevators, escalators | |
54 | Book transportation system | Planifié |
55 | Theft detection | RFID |
56 | Building management system | |
57 | Type of IT infrastructure | |
58 | Other |